use of copy verb in cobol and cics program
Page 1 of 1
use of copy verb in cobol and cics program
Dear friends
i have got a query on copy verb .how does it actually work.
when we use copy verb in the cobol program we use it for code replacement.
whereas when we use the same copy verb in cics-cobol application we
use it for fetching the mapset from the load library .so here we are not using it for code replacement. can anybody clarify this query.
thanks
i have got a query on copy verb .how does it actually work.
when we use copy verb in the cobol program we use it for code replacement.
whereas when we use the same copy verb in cics-cobol application we
use it for fetching the mapset from the load library .so here we are not using it for code replacement. can anybody clarify this query.
thanks
kasthuri- Posts : 212
Join date : 2013-01-27
Similar topics
» JCL to call COBOL program in SYSIN
» Calling program(Assembler/Cobol)
» S04e abend in cobol DB2 program
» Exposing a CICS "COBOL DB2 Code" as a webservice
» CICS program issuing a CALL statement to subprogram.
» Calling program(Assembler/Cobol)
» S04e abend in cobol DB2 program
» Exposing a CICS "COBOL DB2 Code" as a webservice
» CICS program issuing a CALL statement to subprogram.
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|