Issues with having many 01 LEVEL variables
Page 1 of 1
Issues with having many 01 LEVEL variables
Hi,
I have following doubt in 01 level variables declaration in COBOL program.
for example:
01 ws-file-status 9(02).
I heard that though the variable is asking for 2 chars, still mainframe will allocate 1 FULL WORD since the variable is declared as 01 LEVEL. Could some let me know whether this is correct or not?
I have following doubt in 01 level variables declaration in COBOL program.
for example:
01 ws-file-status 9(02).
I heard that though the variable is asking for 2 chars, still mainframe will allocate 1 FULL WORD since the variable is declared as 01 LEVEL. Could some let me know whether this is correct or not?
kasthuri- Posts : 212
Join date : 2013-01-27
Similar topics
» Lower level program error handled in Higher level program
» Swap the values of two similarly-defined variables without a temporary holding variable
» What is LEVEL CHECK
» Level Break Indicators
» Swap the values of two similarly-defined variables without a temporary holding variable
» What is LEVEL CHECK
» Level Break Indicators
Page 1 of 1
Permissions in this forum:
You cannot reply to topics in this forum
|
|